Shah Khant Jayeshkumar

5750

Aquatics Gallery, Science City

In the studio project, we attempted to simulate the process of Integrated Project Delivery and Collaboration using appropriate software tools, planning techniques, and BIM execution plan. Development of models and analysis were done using Lean, BIM and IPD concepts. The studio concepts were used on an upcoming iconic project in Science City, Ahmedabad. Comparisons were done of various concepts using traditional and collaborative approach.


Report Content

Project Brief, Roleplay and lists of tasks perform

Constraints faced by structural consultant, solutions used.

Clash detection & resolution summary for studio scope

Rework cost which would occur if the clashes were not identified at development stage.

A comprehensive analysis of existing site layout and proposed site layout aimed at reducing wastages and streamlining work flow.

4D visualisation to enable video visualisation of the schedule prepared in a project management software and compare it with actual progress

Quantity take-off comparison of manual estimation v/s software enabled estimation to compare time and accuracy by both methods

A study using TVD concept, to select more advantageous material or method. It is a lean concept which helps deliver value.

Duration and cost implications of various iterations with reference to the conventional CPM planning method.

Conclusion