Commercial Retail Complex

The studio is based on the implementation of the Integrated Project Delivery approach with the use of BIM and Lean Construction techniques. The project undertaken for analysis is a commercial mercantile project highlighting the Design coordination & management along with the implementation of the last planner system on a live project. It involved formulation, scheduling & executing the BIM plan along with site layout planning, parametric modelling, clash detection, quantity takeoff, 4D and 5D Simulations along with the application of value engineering & cost optimization. Software like Autodesk Revit & Navisworks, BIM 360, Synchro and VisiLean were used during the studio. 


Report Content

Implementation of BIM and Lean for ICP Studio_Project Introduction

BIM Execution Plan_LOD vs LOS

Model Element Authorisation_Process for Architectural Modelling LOD 200

Process for Architectural Modelling LOD 300_BIM Grading Tool & BIM ROI Tool

Model Uses_Quantity Take-off, Area Schedule, and Visualisation

Collaboration Strategy & Quality Control Procedure

Clash Detection Process & Resolution Process

Clash Resolution Process_Visual Check

Clash Quantification_Discrepancies Observed

Process Mapping & PPC Analysis