Mixed Development Project

MIXED DEVELOPMENT PROJECT The studio focused on implementing Lean and BIM principles to Integrated Project Delivery. A mixed Development project located in Ahmedabad was selected for this studio. To understand the collaborative work, the group members were assigned different roles where I took the role of Contractor and Fire fighting Consultant. The project team at the site implemented the conventional method of BIM despite having a BIM Consultant for the project, which allowed us to implement BIM in a more collaborative and better way. The portfolio focuses on applying the BIM approach, using a number of software-based assessments and several lean principles. To achieve the desired objectives, a BIM execution plan was created that detailed the complex workflow management process. The specifics of numerous disciplines (such as architectural, structural, and MEPF services and Contractors) of a construction project were included in a model of the anticipated scope of work. Weekly reviews of each individual task were conducted, and any necessary actions were then taken. Different exercises, including clash detection, quantity take-off, and site layout analysis, were carried out using a 3D model. Using software like Navisworks Manage and Synchro Pro, a 4D construction sequence of the scheduled activities was generated and combined with a 5D simulation to see the cost implications during the construction phase. Various BIM tools like AR/VR, Dynamo, and Power BI is used for better visualization and monitoring of the project. The studio gave important takeaways from each stage of the project development.


Report Content

Project Brief

LOD vs LOS

Site Layout Analysis

POT Analysis

Fire Fighting Modeling

Quantities

4D

4D Simulation

5D

Inference