Vankadaru Aravind

CM4001

Mixed Development Project

We undertook the study of mixed development project near Ambli, and Ahmedabad. The roles of Architect, Structural Consultant, Mechanical, Electrical, Plumbing, Fire-Fighting Consultant, BIM Coordinator, and Contractor were assigned to each group member. The project team at site implemented conventional method of BIM despite of having a BIM Consultant for the project which gave us an opportunity to implement BIM in more collaborative and better way. The project report focuses on applying the BIM approach, using a number of software-based assessments and several lean principles. To achieve the desired objectives, a BIM execution plan was created that detailed the complex workflow management process. The specifics of numerous disciplines (such as architectural, structural, and MEPF services) of a construction project were included in a model of the anticipated scope of work. Weekly reviews of each individual task were conducted, and any necessary actions were then taken. Numerous exercises, including clash detection, quantity take-off, and site layout analysis, were carried out using a 3D model. Using software’s like Navisworks Manage and Synchro Pro, a 4D construction sequence of the scheduled activities was generated and combined with a 5D simulation to see the cost implications during the construction phase. Various BIM tools such as AR/VR, Dynamo, and Power BI is used for better visualization and monitoring of project. The studio gave important takeaways from each stage of the project's development.

View Additional Work

Report Content

Project Brief

Architect Process Flow

AR - Workflow & Renders

Constraint Analyis - Ar Model

Progess Tracking Ar Model

EL Model Work Flow

Constraint Analysis - EL Model

Augmented Reality & Virtual Reality

Traditional vs IPD Approach

Conclusion

Project Video