Sonawane Bhushan Madhukar

CM4001

High Rise Corporate Space

The project's total built-up area is 34417.60 square feet. The tower consists of a ground floor plus 32 floors as well as 5 basements that span the entirety of the building. The studio's primary focus is on optimizing processes and improving collaboration using modern software. It uses modern approaches such as BIM, IPD, and Lean Construction to address the issues of modern construction projects. BIM Execution Planning, the Last Planner System (LPS), Site Layout Analysis, Design Modelling, 4D and 5D Simulations, Clash Detection, Quantity Take-offs, and the utilization of a Common Data Environment using platforms such as Visilean are among the key deliverables. This comprehensive strategy provides important insights into the advantages of current techniques over traditional industry processes.


Report Content

Project Brief

Clash Detection

Clash Detection

Existing Site Layout

Site Layout Delta

Optimized Site Layout

4D Simulation

4D Use Case

5D Simulation

Conclusion

Project Video