Harish Giri

CM4001

Mixed-Use High Rise Project

The studio emphasizes process optimization and collaboration by utilizing advanced software tools. It incorporates contemporary methodologies like BIM, IPD, and Lean Construction to tackle the complexities of modern construction projects. Key deliverables include BIM Execution Planning, Last Planner System (LPS), Site Layout Analysis, Design Modeling, 4D and 5D Simulations, Clash Detection, Quantity Take-offs, and leveraging a Common Data Environment through collaborative platforms such as Plannerly and Visilean. This approach has provided valuable insights into the advantages of adopting integrated strategies compared to traditional industry practices.


Report Content

Project Brief

Conventional Process Mapping

Employers Information Requirement

BIM Execution Plan

BIM Execution Plan

Architecture Model (LOD 300)

LPS Construction Schedule

LPS Construction Schedule: PPC Analysis

LPS Construction Schedule: Constraint Mapping

Conclusion

Project Video