Madhu Kabra

CM4001

The Commercial Tower

The project is a commercial building in Sargasan, Gandhinagar, featuring three basements, a ground floor, and 14 floors, with a 1.47-acre plot and a built-up area of 5.17 lakh sq. ft. The studio explored this project through BIM, IPD, and Lean Construction to address modern construction challenges. Key deliverables included BIM Execution Planning, LPS, Site Layout Analysis, Design Modelling, 4D/5D Simulations, Clash Detection, Quantity Take-offs, all managed within a Common Data Environment. This study highlighted the advantages of integrated approaches over traditional practices, offering insights into efficient collaboration and project execution.


Report Content

Project Brief

BIM Modelling

Quantity Takeoff

Quantity Takeoff

Last Planner System - Design Activities

Last Planner System - Design Activities

Last Planner System - Site Execution

Last Planner System - Site Execution

4D Simulation - Use Case

Conclusion

Project Video