This studio project involves the design of Sarojavedika, a proposed railway station with steel as the primary structural material. The project began with a detailed study of various steel structural members—beams, columns, trusses, and connections—focusing on their behavior, design principles, and relevant IS codes. These learnings were then applied to the station’s structural design, integrating functionality, stability, and architectural expression through efficient steel construction methods. Here's the link to my detailed booklet of the studio work

View Additional Work

Report Content

Studio and Project Introduction

Case Study Introduction and Drawings

Case study STAAD analysis

Site Introduction and Drawings

Conceptual Mindmap, Design Iterations and Final Design Drawings

Final Design - Sections and Elevations

.Final design load calculation and member sizes

Final design STAAD Analysis

Exploring different joineries and connections