Plumbing Design Studio aims to produce cost-effective, eco-friendly plumbing solutions through observation, practical experience, analysis and estimation. It runs in five modules: observing home plumbing, research topic, project design, digital modeling and a working model. We visited sites to see installations, materials, fittings and layouts, and studied how water supply, drainage and vent systems work in real buildings. We built a 1:1 working model to learn pipe routing, joints, and made a smart toilet with leak detection and water supply shutoff. The project design covered demand, supply, hot water, drainage, sewage treatment, pump sizing and manholes. 


Report Content

A study of the plumbing in Shree Kutchi Leva Patel Samaj Seva Sadan, a G+7 hostel for 300 residents. It traces water from the municipal main to the sewer, compares theoretical and practical daily use and notes good and bad practices on site.

Research on IS 10500:2012 limits for TDS, hardness, chloride, fluoride, residual chlorine and nitrates, with the benefits and risks of each. It also covers the four types of contamination and how acceptable quality differs for drinking, construction and irrigation water.

For the Anand plotting scheme of 161 villas, the estimated population is 1,207 and the total demand is 236 m³ a day. That splits into 112 m³ domestic, 91 m³ landscaping and 33 m³ flushing, with the swimming pool adding about 2.4 m³ a day.

Borewell water is treated in two filtration and softener plants, then stored in a 167.5 m³ underground reservoir and in overhead tanks at each villa. Treated sewage and harvested rainwater cut freshwater use by 53% a year, against the 40% target.

The flow diagram follows every litre from borewell to reuse. The STP receives 130.4 m³ a day and returns 123.9 m³ as treated water, so there is no discharge in summer and 10,509 m³ a year of excess sewage in monsoon.

Domestic and flushing pipes are sized from fixture units at 1.5 m/s, giving 32 mm risers and 15 to 25 mm branches in Duct 2. Each villa has a 105 L heat-pump hot water system with a 25 mm return line.

Drainage branches use 32 to 50 mm traps and a 100 mm stack, sized by drainage fixture units. Each 194 m² terrace is drained by four 75 mm PVC pipes designed for a peak rainfall of 54.27 mm/h.

Wastewater runs about 95 m at a 1:100 slope from the septic tank through IC1 and four manholes. Invert depth increases from 0.77 m to 1.72 m, and the pipe grows from 100 mm to 150 mm. A natural septic tank of 3.18 × 1.27 × 0.77 m serves each villa.

Surface runoff is recharged through 34 percolation wells, each 3 m wide with a 60 m bore. Two main pumps lift water from the underground tanks to the farthest villas, and a smaller pump serves the WTP, all sized with the Hazen-Williams formula.

This working model closes the water supply as soon as a toilet leak is detected. Flow and vibration sensors from the other team send a HIGH signal to an Arduino Uno, which switches a 5V relay and shuts a 12V solenoid valve. The valve stays closed until someone presses the reset button after the repair, and the reset only works once the signal is back to LOW, so water can't return to a live leak.