• Home
  • FT
  • CT2014
  • Plumbing Design Studio-Hospital in Vadodara

Arun Thamil Kumaran P

CT2014

Plumbing Design Studio-Hospital in Vadodara

The studio explored plumbing from source to use, treatment and reuse. A field study of CEPT’s FT building documented supply, storage, fixtures and drainage, while research examined swimming-pool filtration and disinfection. The Vadodara hospital project combined water-demand calculations, daily and annual balances, treatment and storage sizing, supply and drainage design, Revit coordination and quantity schedules. HydroSense extended this work into a working model, using paired vibration sensors, flow measurement and a dashboard to investigate leak detection and location, supported by testing and an exhibition design.

View Additional Work

Report Content

FT Plumbing

Research Topic- Swimming Pool Water Treatment

Hospital in Vadodara- Water Demand

Daily Water Balance

Treatment, Storage and Pumps

Pipe Sizing Vertical

Revit

Working Model-Introduction

Working Model-Dashboard

Working Model-Exhibition Display