Arun Thamil Kumaran P

CT2036

Design of Process of a Road

The project is the design of a road in less than ideal terrain, in my case undulating agricultural terrain and design a road on that basis, our purpose is to relive the traffic off NH-27 and NH-41 by providing alternative routes for trucks. We have used IRC codes to standardize our Horizontal and Vertical alignments, we designed side drains as well as cross-drain structures. We  designed the Pavement based on projected traffic, added safety signage and markings and finally did an approximate cost analysis for the same.


Report Content

The site was Samakhiali to Rapar, our focus is the industrial traffic from Mundra and Kandla ports.

Terrain Analysis of the site gives the terrain type as flat, LULC gives majority as Agriculture, thee soil map gives 2 types of soil, Sandy Loam and Loam

Horizontal Alignment of the route has 5 Horizontal curves, all of which comply with IRC standards, with a roundabout at the end.

Vertical Alignment has 5 curves 3 Summit and 2 Valley curves, also compliant with IRC codes.

Two typical cross-sections one on embankment and one in cut as well as the Mass-Haul diagram showing minimal excess soil.

Drainage with the Catchment areas , side drain profile and Cross Drain cross section, which is a 1200mm NP4 Hume Pipe

Traffic data calculation and Pavement design , pavement thickness 640mm excluding subgrade for traffic 17.5 msa

Safety plan showing location of various signs.

Roundabout details and signage inventory

Cost analysis giving a cost per km of 2.92cr