We designed a new road from Piplaidevi to Don Hill in Gujarat's Dang district. It's about 24.7 km long and runs through hilly, forested country. We studied the land, compared four possible routes, and picked Route 4 because it links villages that have no road today and helps tourism. The road is built for 30 km/h with a 7 m wide carriageway. We also worked out the layers of the pavement, the drainage, and safe junctions.

View Additional Work

Report Content

Site and study area: the Dang district, 47 villages and the 24.67 km Piplaidevi to Don Hill road, with the reasons for building it.

Terrain study: land cover, contours, slope, roughness and streams across the study area.

Route alternatives: four candidate routes compared on terrain, land use, hydrology and settlements, with Route 4 chosen as the final route.

Horizontal alignment: plan view of the final route with 30 km/h geometric design parameters and curve widening for hairpin bends.

Vertical alignment and slope stabilisation: longitudinal profile, gradient criteria, and cut and fill treatment along the route.

Cross sections and earthwork: typical sections along the route, the mass haul diagram and earthwork quantities.

Pavement design: flexible pavement for 11.37 msa design traffic on a CBR 5% subgrade, with layer thicknesses and materials.

Drainage design: catchment areas, design discharge by the Rational Method, and side drain and culvert details.

Road safety plan and junctions: junction layouts, signage and safety measures at key locations.

Design summary and SWOT analysis: the final design at a glance, with its strengths, weaknesses, opportunities and threats.