Alind Kumar

BP4004

SYSTEM DEVELOPMENT METHODOLOGY

This studio aimed at making the students learn manufacturing processes and how to take a design concept to its mass manufacturing level. This was a 16 weeks program that includes three major studio projects. The other exercises were material researches, preparing Bill Of Quantity for mass manufacturing, to understand how different materials behave together, possible joinery details, appropriate hardware to assemble all the components of the product. My 4 major projects are Modular footpath, Storm Drain System, Door Locking system and Cloth hanger


Report Content

SHEET 1- STORM WATER DRAIN

SHEET 2 -STORM WATER DRAIN

SHEET 3 -MODULAR FOOTPATH

SHEET 4 -MODULAR FOOTPATH

SHEET 5 -MODULAR FOOTPATH

SHEET 6 - DOOR LOCKING SYSTEM

SHEET 7 - DOOR LOCKING SYSTEM

SHEET 8 - DOOR LOCKING SYSTEM

SHEET 9 - CLOTH HANGER

SHEET 10 - CLOTH HANGER