Sharmishtha Govind Makwana

SD4007

TEMPORARY EXHIBITION CENTRE USING STEEL

This studio focuses on developing a more comprehensive understanding of diverse building materials and synthesizing architectural and structural principles. The main studio project involves site assessment, form development, and a structural member analysis. This project analyses a hexagonal dome with a higher and shorter rise while keeping a constant base.

View Additional Work

Report Content

Problem Statement

Form Development

Architectural Drawings- 9 meters Rise

Architectural Drawings- 7 meters Rise

Preliminary Data

Wind Load

Analysis for both the rises

Check For Deflection

Comparison

Possible Connections and Conclusion